LATEST ON DHOLERA

The work of TATA’s solar power plant is in pace

The work of TATA’s solar power plant is in pace, land has been alloted and even machinery has reached to the respective land.

Leave a Reply

Your email address will not be published. Required fields are marked *

01.
Copyright © 2019 Seksaria Group. All rights reserved.Design By Embtel Solutions
Back to top